Conversion of the existing conventional boiler house for 24-hour unattended operation.
Design, permitting, complete installation and commissioning of the boiler house and the heat substation. Preparation of the piping and instrumentation diagrams (P&ID), functional descriptions, and basic, permit and detailed designs for the boiler house and the connected parts affected by the conversion.
Main equipment:
Two 12 t/h steam boilers and one 7 t/h steam boiler made by Láng, with combined duo-block burners; steam distribution and collection headers complete with valves and fittings; auxiliary equipment, electrical power equipment, control components, supervisory system.
Client: Sinergy Kft.
About the facility:
The boiler plant meets the entire heating demand of the Opel car plant in Szentgotthárd as well as its demand for 4 bar process steam. The converted heat substation runs unattended 24 hours a day. The integrated subsystems allow the main equipment to run automatically without an operator (e.g. condensate level control, boiler blowdown, continuous monitoring of boiler feedwater salinity and conductivity).