South Korea's SK Innovation built its electric vehicle battery plant in the Komárom industrial park with an investment of HUF 97.5 billion.
At the end of 2018 we signed a contract with the owner's engineer, Hyundai Engineering, for the detailed design and full delivery of the utility facilities. Construction began in early 2019 with the installation of the major equipment supplied by the client (steam boilers, air compressors and chillers) and continued with the piping work, in close cooperation with the client.
