Overview:
Turnkey construction of an alcohol tank farm, a denaturing station and a road tanker loading facility at a grain processing plant being built on the outskirts of Tiszapüspöki
Scope of supply:
Design, fabrication and pressure testing of 2 alcohol tanks of 2,500 m3 each
All design required for the project (architectural, mechanical, electrical and control, fire protection), and all construction work
Performance data:
2 tanks of 2,500 m3 each (395 t of P265GH plate)
road tanker loading
multiple denaturants, mass-flow-based control
Client: Tisza-TK Projekt Kft.
Execution: 02/2016 – 05/2017



