Overview:
Mechanical detailed design and construction of a pipe bridge at a grain processing plant being built on the outskirts of Tiszapüspöki
Scope of supply:
All design required for the project (mechanical), and all construction work
Performance data:
900 m route length
10 km of piping
DN 25 – DN 600 size range
PN 16 – PN 25 pressure rating
Client: Tisza-TK Projekt Kft.
Execution: 10/2016 – 04/2017