Reference project

Dunamenti Erőmű — Unit G2 filter house

Combustion air supply for gas turbine Unit G2 at Dunamenti Erőmű: complete design and construction of the air intake filter house.

Combustion air supply for gas turbine Unit G2 at Dunamenti Erőmű: complete design and construction of the air intake filter house.

Client: G + H Montage GmbH

Detailed design, fabrication, supply, site installation

About the equipment:

The air intake filter house provides the specified filtration of the 100,000 m3/h of intake air for the 230 MWe gas turbine Unit G2 at Dunamenti Erőmű. The filter house is a multi-level steel structure in which three different filter stages operate one behind the other, in several layers. The maximum operating pressure drop across the filter house specified by the gas turbine manufacturer is 300 Pa. We fitted the combustion air intake filter house with an anti-icing system.

Request a quote

Planning an energy project?

Send us the scope or the drawings — we will review them and agree the next step with you: design, construction or full EPC.