Expansion of Főtáv's Füredi út hot water network system with three new gas engine units. Construction, commissioning and handover of three gas engine generator sets and their auxiliary systems; design and construction.
Client: Sinergy Kft.
About the facility
Main parameters of the combined heat and power plant:
- Electrical output: 18.18 MW
- Thermal output: 17.1 MW
Main equipment:
Gas engines: three units
Supplier: Wärtsilä
Type: 18 V34SG
- Electrical output: 6.06 MW
- Thermal output: 5.7 MW
- Electrical efficiency: 43.9%
- Thermal efficiency: 34.6%
Electrical system (medium and low voltage):
Supplier: ABB