As general contractor, construction, completion and commissioning of the steam supply for the new facilities of the Mátra Industrial Park, covering: mechanical, control and power construction; fabrication, equipment supply and installation; trial operation and commissioning; training and as-built documentation
Client: Mátrai Erőmű Zrt.
About the facility:
The heat demand of the new facilities on the Mátrai Erőmű site is met by steam from two extraction lines of the high pressure turbines of Units III, IV and V of Mátrai Erőmű Zrt.
Kraftszer Kft. built the pipelines supplying steam to the Baumit, bioethanol and biodiesel plants. The Baumit and bioethanol branches in full, and the section of the biodiesel line at the steam pressure reducing station, fall under the PED (Category III). Conformity of the structures was certified by experts from ÉMI-TÜV Bayern Kft.