- Delivery of the systems serving the new combined-cycle power plant (design, construction, commissioning).
- Design, installation and commissioning of all yard piping systems:
- Steam systems (high pressure, 42 and 16 bar)
- Other utility systems (serving the gas and steam turbines)
- Complete delivery of the oil supply, make-up, drain, blowdown and hot water systems
- Mechanical, electrical and control design, construction and commissioning; design, fabrication and permitting of a 300 m3 oil tank.
- Oil supply system from the oil pump house to the valve trains of the auxiliary boilers.
- Supply, installation and erection of tanks, pumps, heat exchangers, valves, instruments and other equipment.
- Start-up and commissioning of all systems.
- Pressure tests by system and medium.
- Construction of temporary installations, cleaning and blowing out. Supervision and operation during start-up, recording of IQ/OQ data sheets.
Investor: TVK Erőmű Kft.
Complete piping delivered for the following systems:
- Gas turbine oil supply system
- De-icing system
- High pressure steam systems (16 bar and 42 bar)
- Pressurisation system
- Drain water system
- Compressed air system
- Closed cooling water system
- Fuel supply systems (gas and oil)
- Hot water system
- Make-up water system
- Blowdown water system